TARIFFS

Our Projects
We are committed to bring about major development to the community
Our Projects
We are committed to bring about major development to the community
Our Projects
We are committed to bring about major development to the community

Tariffs

Water Tariffs

Meters
Description
2024 - 2025
2025 - 2026
Increase
Basic Residential
105.00
105.00
0.00%
Basic Business
125.00
125.00
0.00%
Basic Schools
115.00
115.00
Description
2024 - 2025
2025 - 2026
Increase
0 - 15,00 m³ (new)
19.00
19.00
0.00%
16 - 35,00 m³ (0 - 35,00 Previous financial years)
23.50
23.50
0.00%
36 - 85,00 m³
29.50
29.50
0.00%
86 m³ +
42.50
42.50
0.00%
Pre-Paid Residential Town
24.00
24.00
0.00%
Pre-Paid - Tutungeni
20.00
20.00
0.00%
Description
2024 - 2025
2025 - 2026
Increase
>500 KL
24.00
24.00
0.00%
Schools (New)
23.50
23.50
0.00%
On approved application: Churches, Clinic; Non-Profit
23.50
23.50
0.00%
Description
2024 - 2025
2025 - 2026
Increase
Town - Business: Deposit
2,000.00
2,000.00
0.00%
Town - Residential: Deposit
700.00
1,000.00
42.86%
Tutungeni - Deposit
650.00
650.00
0.00%
Water Tokens - Pre-Paid: Tutungeni
350.00
350.00
0.00%
Testing of water meter: Business (Deposit Repayable if meter is faulty)
1,650.00
1,650.00
0.00%
Testing of water meter: Residential (Deposit repayable if meter is faulty)
550.00
550.00
0.00%
Replacement of water meters
Labour N$ 250.00 plus meter
Description
2024 - 2025
2025 - 2026
Increase
Size of Inlet:
92.50
92.50
0.00%
20 mm or smaller (Residential)
700.00
700.00
0.00%
40 mm
1,080.00
1,080.00
0.00%
50 mm
1,975.00
1,975.00
0.00%
80 mm
3,400.00
3,400.00
0.00%
>80mm
3,400.00
3,400.00
0.00%
Fire Connection
1,080.00
1,080.00
0.00%
Bulk Sewer disposal rate (per m3)
12.50
12.50
0.00%
Treated sewer water (per m3)
6.00
6.00
0.00%

Water Tariffs Electricity Tariffs (ECB - Proposed)

Description
2024 - 2025
2025 - 2026
Increase
Conventional Meters
Rate Effective: 1 July
3.15
3.31
5.00%
ECB = NEF Levy
0.0372
0.0372
0.00%
Pre-paid meters: Town & Tutu Business
Rate Effective: 1 July
3.20
3.40
6.25%
ECB = NEF Levy
0.0372
0.0372
0.00%
Pre-paid meters: Residential Town
Rate Effective: 1 July
3.15
3.31
5.00%
ECB = NEF Levy
0.0372
0.0372
0.00%
Pre-paid meters: Tutungeni
Rate Effective: 1 July
2.75
2.89
5.00%
ECB = NEF Levy
0.0372
0.0372
0.00%
Description
2024 - 2025
2025 - 2026
Increase
Application Pre-Pay electricity connection - Tutungeni (Zinc)
150.00
150.00
0.00%
Application Pre-Pay electricity connection - Tutungeni (Brick)
200.00
200.00
0.00%
Application Pre-paid Elec Tutungeni - Business
300.00
300.00
0.00%
Application for Pre-Pay electricity connection - Town
300.00
300.00
0.00%
Electricity Deposit - Town/Business
2,300.00
2,300.00
0.00%
Electricity Deposit - Town/Residential
1,200.00
1,200.00
0.00%
Prepaid Electricity Box
Town
1,230.00
1,230.00
0.00%
Tutungeni
980.00
980.00
0.00%
Replacement of Electricity meters
Labour N$ 250.00 plus meter
Call out - After hours
Town
250.00
300.00
20%
Call out - After hours
Tutungeni
90.00
90.00
0.00%
Re-set of Pre-Pay Electricity: Tutungeni
90.00
90.00
0.00%
Penalty Illegal Connections: (any illegal, dangerous connections; including supplying electricity through extensions to separate standing constructions)
5,000.00
5,000.00
0.00%

Sewer Treatment Plant

Description
2024 - 2025
2025 - 2026
Increase
Sanitation Per Toilet (Residential)
96.50
0.00%
Sanitation Per Toilet (Residential - additional)
90.00
0.00%
Sanitation Per Toilet (Business)
110.00
110.00
0.00%
Sanitation Per Toilet (Business - additional)
95.00
95.00
0.00%
Sanitation Per Toilet (Schools)
35.00
35.00
0.00%
Sewer Connection - Town
785.00
785.00
0.00%
Sewer Connection - Tutungeni
375.00
375.00
0.00%
Septic Tank (Office Hours: 08h00-13h00;14h00-16h00)
300.00
300.00
0.00%
Septic Tank (Outside town boudaries)
600.00
600.00
0.00%
Septic Tank (After Hours, Week Ends & Public Holidays)
400.00
400.00
0.005

Refuse Removal

Description
2024 - 2025
2025 - 2026
Increase
Wheelie Bin (Refuse monthly tariff Per Bin) - Residential
230.00
230.00
0.00%
Wheelie Bin (Refuse monthly tariff Per Bin) - Business
260.00
260.00
0.00%
New Wheelie Bin to Purchase (Cost +)
1,400.00
1,400.00
0.00%
Description
2024 - 2025
2025 - 2026
Increase
Ad Hoc Drums (maximum period of two days)
65.00
65.00
0.00%
Permanent Drums
210.00
210.00
0.00%

Land-fill site dump charges

Description
2024 - 2025
2025 - 2026
Increase
Light Pick-up Truck/ Less than 1Ton /per Load
65.00
65.00
0.00%
Truck: 1,00 Ton – 3Ton/per Load
215.00
215.00
0.00%
Trucks: Above – 3Ton/per Load
485.00
485.00
0.00%
Description
2024 - 2025
2025 - 2026
Increase
Truck: 1,00 Ton – 3Ton/per Load
245.00
245.00
0.00%
Trucks: Above – 3Ton/per Load
500.00
500.00
0.00%

Emptying of skips

Description
2024 - 2025
2025 - 2026
Increase
Ad hoc Skips (Business)
500.00
500.00
0.00%
Garden Refuse (max 3 days) (Residential only)
220.00
220.00
0.00%
Permanent Skips
2,300.00
2,300.00
0.00%
Additional skip requested to permanent skip at reduced tariff
1,350.00
1,350.00
0.00%
Multiple Skips (clean more than once per week)
2,900.00
2,900.00
0.00%

Availability Levies Undeveloped Erven

Description
2024 - 2025
2025 - 2026
Increase
Electricity
50.00
50.00
0.00%
Water
95.00
95.00
0.00%
Sewerage
85.00
85.00
0.00%
Refuse
200.00
200.00
0.00%
Description
Up to:
2024 - 2025
2025 - 2026
Increase
Residential erven
1 000 m2
510.00
528.00
3.70%
1001 - 2000 m2
625.00
648.13
3.70%
2001 - 3000 m2
750.00
775.75
3.70%
Business erven
1000 m2
2,250.00
2,333.25
3.70%
1001 - 2000 m2
3,000.00
3,111.00
3.70%
2001 m2 and greater
2,600.00
2,696.00
3.70%

Tutungeni Service Fees

Description
2024 - 2025
2025 - 2026
Increase
Residential Plot
120.00
120.00
0.00%
Business Plot
240.00
240.00
0.00%

Jan Plank Hall

Description
Deposit
Rental
Increase